Solar And PV Systems

PV array size, solar panel count, string voltage, cable voltage drop, charge controller checks, and solar energy output.

What this group covers

Solar And PV Systems groups 3 calculator topics and 13 individual calculators in total. The calculators answer 10 on equipment Review, 5 on field Layout, 4 on backup Power, 4 on engineering Estimate, 3 on battery Storage. Open a topic below for its calculators, formulas, and review notes.

Written for Electricians, Engineers, Estimators, Facility Teams, and Inspectors.

Standards basis across the group: AS/NZS 5033 (1), IEC 60364 (1), IEC 60364-7-712 (1), NFPA 70 (NEC) (6).

Solar work is a chain, and every link has a voltage window

A PV system is a chain of conversions, and the calculation that catches designs is almost never the energy estimate. It is the voltage window: string voltage at the coldest expected temperature against the inverter maximum, and string voltage at the hottest expected temperature against the inverter start voltage. A string that is correct at standard test conditions can be over-voltage on a cold clear morning and under-voltage on a hot afternoon roof.

The order that works is array, then string, then conductor, then the AC side. Array and string work establishes the voltage and current the conductors will actually carry, including the temperature extremes. Conductor work then covers voltage drop on both the DC and AC sides, which behave differently and are not interchangeable. The AC side is where a PV system meets the same voltage-rise and interconnection questions as any other generator.

Energy and yield calculations are their own family and answer a different question from the electrical design. A production estimate does not tell you whether the conductor is adequate, and a conductor calculation does not tell you whether the array will produce the expected energy. Keeping the two records separate prevents a design review from accepting one as evidence for the other.

Solar work also overlaps the load and backup categories whenever storage is added. A battery-backed system has to satisfy the array, the inverter, the battery, and the backed-up loads at once, and the binding constraint is usually whichever of those four has the least headroom.

Record the temperature assumptions with every string result, because they are what the result depends on. The coldest expected temperature at the array and the hottest expected cell temperature are project facts, not defaults, and a string calculation without them cannot be checked by anyone else. Where a design has both a cold-morning over-voltage risk and a hot-afternoon under-voltage risk, the two records are separate and both belong in the file.

Which topic to open first

  • Solar PV Electrical

    Start here for string voltage, string current, and DC conductor calculations.

  • Solar PV Design

    Start here for array and system design work that precedes the conductor calculations.

  • Solar PV Energy

    Start here for production and energy yield estimates.

Sub-topics in this group

Solar And PV Systems resolves into 15 working sub-topics. The calculators behind them are listed on each topic page below rather than repeated here, and a calculator appears under every sub-topic it serves, so the counts overlap where one page answers more than one question.

  • Solar PV Design 4

    Solar panel count, array wattage, tilt angle, azimuth, roof area, and microinverter planning calculators.

    Serves Engineering Estimate (3), Equipment Review (3), Field Layout (3).

    PV design workflows are planning estimates. Confirm site survey, shading, roof and structural conditions, equipment listings, utility rules, and qualified design review.

  • Solar PV Electrical 6

    PV string voltage, current, cable voltage drop, and charge-controller checks.

    Serves Equipment Review (6), Backup Power (2), Capacity Margin (2).

    PV electrical workflows are screening estimates. Confirm module and inverter data, conductor ratings, overcurrent protection, temperature limits, utility rules, and adopted code.

  • Solar PV Energy 3

    PV production, solar kWh, self-consumption, grid export, project cost, and cost per kWh calculators.

    Serves Energy Cost (3), Battery Storage (2), Equipment Review (1).

    PV energy workflows depend on entered yield, load, utility, and equipment assumptions. Confirm weather model, tariff, interconnection terms, and qualified review.

  • Equipment Review 10

    Equipment-data and nameplate review workflows.

  • Field Layout 5

    Field layout calculations and measurement workflow support.

  • Backup Power 4

    Generator and backup-power planning workflows.

  • Engineering Estimate 4

    Formula-backed estimates that require professional verification before final use.

  • Battery Storage 3

    Battery energy, runtime, and capacity estimation workflows.

  • Capacity Margin 3

    Capacity, margin, and preliminary headroom screens.

  • Energy Cost 3

    Energy-use, rate, and operating-cost calculations.

  • Power Electronics 2

    Power-electronics and component behavior screens.

  • Voltage Drop 2

    Voltage-drop and conductor-length calculation workflows.

  • Line Current 1

    Line-current and phase-model arithmetic workflows.

  • Load Accounting 1

    Transparent connected-load and worksheet accounting workflows.

  • Operating Cost 1

    Operating-cost estimates based on entered rates and usage.

  • Savings Screen 1

    Preliminary energy-savings and payback screens.

  • Solar Backup 1

  • Voltage Readings 1

    Voltage measurements and voltage-ratio comparison workflows.

Review basis

Solar workflows use entered assumptions and do not approve listed equipment, protection, transfer equipment, battery safety, utility interconnection, or code compliance.

Everything under Solar And PV Systems is a calculation from values you enter, not an approval. The pages here cite AS/NZS 5033, IEC 60364, and IEC 60364-7-712 among their basis, so confirm the edition adopted in your jurisdiction against the source text before relying on a number for design or installation.

Where to go next: Solar PV Design, Solar PV Electrical, and Solar PV Energy and the formula reference, all calculators, or printable worksheets for the same calculations.