Electrical Reference Charts and Worksheets

Published charts and worksheets appear here when they are ready for use.

Reference charts and printable worksheets for the checks that are easier to run by hand than by calculator: conductor and raceway tables, load schedules, derating worksheets, and bend-layout references. Each one states the basis it was built from, so it can be checked against the adopted code edition and the project conditions.

15 published references. Looking for a worksheet for a specific calculator instead? Browse the calculator worksheet index.

Ampacity and Derating Worksheet

Record conductor ampacity, temperature correction, adjustment factors, terminal ratings, and limiting conditions for feeder and branch-circuit sizing.

  • August 20, 2026
Open

Cable Tray Fill Worksheet

Print this worksheet to record cable tray dimensions, cable data, calculated fill, spacing checks, and the selected tray.

  • August 20, 2026
Open

Conduit Bend Multiplier Chart

Use this conduit bend multiplier chart to estimate layout spacing from a rise and outside bend angle for offset, saddle, and kick bends.

  • August 20, 2026
Open

Conduit Fill Chart

Use this conduit fill chart to select the 53%, 31%, or 40% fill percentage by conductor count, then verify raceway area and conductor dimensions.

  • August 20, 2026
Open

kWh Cost Worksheet

Print this worksheet to record load power, operating schedule, energy rate, estimated kWh, and monthly energy cost.

  • August 20, 2026
Open

Motor Starting Current Worksheet

Print this worksheet to record motor data, starting method, estimated starting current, source capacity, and starting voltage-drop checks.

  • August 20, 2026
Open

Panel Load Schedule Worksheet

Print this worksheet to record panel circuits, connected loads, demand notes, calculated totals, and the review basis for panel or service sizing.

  • August 20, 2026
Open

Pull Box Sizing Worksheet

Print this worksheet to record raceway entries, conductor sizes, pull type, calculated dimensions, and the selected pull-box size.

  • August 20, 2026
Open

Saddle Bend Layout Worksheet

Use this saddle bend layout worksheet to record conduit size, obstruction height, bend angles, center, near and far marks, and estimated shrink before bending.

  • August 20, 2026
Open

Shunt Resistor Worksheet

Print this worksheet to record shunt measurement requirements, calculated resistance, power dissipation, and the selected resistor rating.

  • August 20, 2026
Open

Transformer Sizing Worksheet

Print this worksheet to record transformer load and voltage data, calculated kVA, impedance, protection, and the selected transformer.

  • August 20, 2026
Open

Voltage Drop Worksheet

Print this worksheet to record circuit data, conductor selection, voltage-drop results, and the check used to support the final conductor size.

  • August 20, 2026
Open

Wire Sizing Worksheet

Print this worksheet to document conductor-sizing checks, including load, voltage, ampacity, derating, voltage drop, and terminal ratings.

  • August 20, 2026
Open

When a chart or worksheet beats a calculator

A calculator answers one question with the values you type into it. A chart or a worksheet answers a different one: it records the reasoning, so the answer can be checked later by someone who was not there when it was produced. That is why the reference pages here are not duplicates of the calculators. The calculator gives the number; the worksheet is what the number gets written onto when it has to survive a plan review, a second shift, or a call-back six months later.

Reach for the chart form when the value is looked up more often than it is computed. A conduit bend multiplier, a raceway fill percentage, or a resistor colour band does not change with the project, so a table you can read at a glance on a ladder beats a form you have to fill in. Reach for the worksheet form when the calculation has inputs that are project-specific and an output that someone else will review against a rule.

Worksheets here follow the same layout on purpose: the identifying fields come first, then the measured or nameplate inputs, then the calculation space, then the result with its basis and any limiting condition. That order mirrors how a field record is actually built, and it means a reviewer can see whether a number came from a measurement, a nameplate, or a table lookup without guessing.

A worksheet with an empty field is more useful than a worksheet with a guessed one. Where an input was not available, write that down. An assumed ambient temperature or an estimated length that is not marked as an assumption is the most common defect in an otherwise correct record, because the next reviewer has no way to tell it apart from a measured value.

What the checks behind these pages have in common

Every worksheet on this page is built on the same three-part structure: a basis that can be cited, a calculation that can be repeated, and a result that states its own limits. Ampacity derating, cable tray fill, panel load schedules, voltage drop, transformer sizing, and bend layout look unrelated as tasks, and they are unrelated in method, but they are identical in what makes the record usable. A basis, a repeatable calculation, and a stated limit are what turn a note into a document.

Where a worksheet depends on a code table, the table edition matters and the worksheet says which one it used. Where it depends on manufacturer data, the model and revision matter. Where it is pure arithmetic, no citation is needed and the formula is printed on the page. Mixing those three without labelling them is what makes a record hard to audit, so the pages keep them apart deliberately.