Wire, Raceway And Ampacity

Wire sizing, ampacity derating, conduit fill, cable tray fill, voltage drop, and raceway checks.

Sub-topics in this category

The 38 calculators in Wire, Raceway And Ampacity grouped into 14 sub-topics by the work each is built for. A calculator appears under every sub-topic it serves, so these groups overlap where the same page answers more than one question.

Engineering Estimate

Formula-backed estimates that require professional verification before final use.

Raceway Layout

Conduit, duct-bank, and raceway geometry workflows.

Equipment Review

Equipment-data and nameplate review workflows.

Field Layout

Field layout calculations and measurement workflow support.

Capacity Margin

Capacity, margin, and preliminary headroom screens.

Line Current

Line-current and phase-model arithmetic workflows.

Field Verification

Measured field data reduction and verification workflows.

Voltage Drop

Voltage-drop and conductor-length calculation workflows.

Load Accounting

Transparent connected-load and worksheet accounting workflows.

Conductor Resistance

Grounding

Grounding and earth-electrode measurement workflows.

Cable Envelope

Concrete Encased

Concrete-encased conduit and duct-bank quantity workflows.

Temperature Effects

What this topic covers

About this category

38 calculators are grouped under Wire, Raceway And Ampacity, and the work splits into Engineering Estimate, Raceway Layout, Equipment Review, Field Layout. Every page states the formula it applies, the inputs and units it expects, and the limits of the estimate, so a result can be checked against the adopted code edition and the equipment nameplate before it is used for a design decision.

Written for Electricians, Engineers, Estimators, Facility Teams, Inspectors, and Technicians.

Basis cited across this topic: BS 7671 (1), IEC 60364 (1), IEEE (1), IEEE 1185 (1), NFPA 70 (NEC) (22). Each calculator lists its own source citation and review dates on its page.

Formulas used in this category

The arithmetic the 38 calculators in Wire, Raceway And Ampacity apply, in the order it is evaluated. These are calculation summaries, not code text — verify each against the source standard before design use. Full explanations for every topic are in the formula reference index.

Show formula sheet (38 calculators)
Ampacity Calculator
  • \(I_{\mathrm{adjusted}} = I_{\mathrm{base}} \times F_{\mathrm{adjustment}} \times F_{\mathrm{temperature}}\)
  • \(F_{\mathrm{combined}} = F_{\mathrm{adjustment}} \times F_{\mathrm{temperature}}\)
  • \(\mathrm{Total\ factor\ percent} = F_{\mathrm{adjustment}} \times F_{\mathrm{temperature}} \times 100\%\)
  • \(\mathrm{Conductor\ count} \ge 4 \Rightarrow \mathrm{review\ flag\ only}\)
  • \(\mathrm{No\ conductor\ size\ or\ code-compliant\ final\ selection\ is\ made}\)
  • conductor count is a review flag only
AWG Wire Resistance Calculator
  • \(K=\text{material resistance constant},\quad \alpha=\text{temperature coefficient},\quad \Delta T=T-20^\circ\mathrm{C}\)
  • \(L=\text{one-way conductor length},\quad N=\text{conductors included in the resistance path}\)
  • \(d_{\text{in}} = 0.005 \times 92^{(36-\mathrm{AWG})/39}\)
  • \(d_{\text{mil}} = 1000 \times d_{\text{in}}\)
  • \(\mathrm{CM} = d_{\text{mil}}^2\)
  • \(R_{20} = \frac{K \times 1000}{\mathrm{CM}}\)
Box Fill Calculator
  • \(V_{\mathrm{conductors}} = N_{\mathrm{conductors}} \times V_{\mathrm{allowance}}\)
  • \(V_{\mathrm{fill}} = V_{\mathrm{conductors}} + V_{\mathrm{device}} + V_{\mathrm{clamp}} + V_{\mathrm{grounding}}\)
  • \(V_{\mathrm{remaining}} = V_{\mathrm{box}} - V_{\mathrm{fill}}\)
  • \(\mathrm{fill\ percent} = \frac{V_{\mathrm{fill}}}{V_{\mathrm{box}}} \times 100\)
Cable Bend Radius Calculator
  • \(D_{\text{cable}}=\text{cable outside diameter},\quad M_{\text{bend}}=\text{bend-radius multiplier},\quad \theta=\text{bend angle}\)
  • \(R_{\min} = D_{\text{cable}} \times M_{\text{bend}}\)
  • \(D_{\text{bend}} = 2 \times R_{\min}\)
  • \(L_{\text{arc}} = R_{\min} \times \frac{\theta}{360} \times 2\pi\)
Cable Jacket Diameter Calculator
  • \(t_{\mathrm{layer}} = t_{\mathrm{insulation}} + t_{\mathrm{shield/tape}} + t_{\mathrm{jacket}}\)
  • \(D_{\mathrm{nominal}} = D_{\mathrm{conductor}} + 2t_{\mathrm{layer}}\)
  • \(D_{\mathrm{planning}} = D_{\mathrm{nominal}} \times \left(1 + \frac{T_{\%}}{100}\right)\)
  • \(A = \pi\left(\frac{D}{2}\right)^2\)
Cable Pull Bend Count Calculator
  • \(\theta_{\mathrm{row}} = \theta_{\mathrm{bend}} \times N_{\mathrm{bend}}\)
  • \(\theta_{\mathrm{total}} = \sum \theta_{\mathrm{row}}\)
  • \(\theta_{\mathrm{remaining}} = \theta_{\mathrm{limit}} - \theta_{\mathrm{total}}\)
Cable Tray Fill Calculator
  • \(A_{\mathrm{occupied}} = \sum\left(A_{\mathrm{cable}} \times N_{\mathrm{cable}}\right)\)
  • \(\mathrm{fill\ percent} = \frac{A_{\mathrm{occupied}}}{A_{\mathrm{tray}}} \times 100\)
  • \(A_{\mathrm{limit}} = A_{\mathrm{tray}} \times \frac{L_{\%}}{100}\)
  • \(M_{\mathrm{fill}} = A_{\mathrm{limit}} - A_{\mathrm{occupied}}\)
Cable Tray Separation Calculator
  • \(S_{\mathrm{total}} = (N_{\mathrm{groups}} - 1) \times S_{\mathrm{minimum}}\)
  • \(W_{\mathrm{required}} = N_{\mathrm{groups}} \times W_{\mathrm{group}} + S_{\mathrm{total}} + 2C_{\mathrm{edge}}\)
  • \(M_{\mathrm{tray}} = W_{\mathrm{usable}} - W_{\mathrm{required}}\)
Cable Tray Width Calculator
  • \(W_{\mathrm{planned}} = W_{\mathrm{cable}}\left(1 + \frac{S_{\mathrm{allowance}}}{100}\right)\)
  • \(W_{\mathrm{usable}} = \frac{W_{\mathrm{planned}}}{F_{\mathrm{usable}}/100}\)
  • \(W_{\mathrm{minimum}} = W_{\mathrm{usable}} + 2E_{\mathrm{edge}}\)
  • \(M_{\mathrm{width}} = W_{\mathrm{selected}} - W_{\mathrm{minimum}}\)
Conductor Ampacity Correction Factor Calculator
  • \(F_{\mathrm{total}} = F_{\mathrm{ambient}} \times F_{\mathrm{conductor-count}}\)
  • \(I_{\mathrm{adjusted}} = I_{\mathrm{base}} \times F_{\mathrm{total}}\)
  • \(M_I = I_{\mathrm{adjusted}} - I_{\mathrm{load}}\)
  • \(U_{\%} = \frac{I_{\mathrm{load}}}{I_{\mathrm{adjusted}}} \times 100\)
Conductor Current Density Calculator
  • \(J_{\mathrm{A/mm^2}} = \frac{I}{A}\)
  • \(J_{\mathrm{A/cm^2}} = 100J_{\mathrm{A/mm^2}}\)
Conductor Resistance Calculator
  • \(R = \rho\frac{L}{A}\)
  • \(G = \frac{1}{R}\quad\text{when }R>0\)
Conductor Resistance Temperature Calculator
  • \(\Delta T = T_2 - T_1\)
  • \(R_2 = R_1 \left[1 + \alpha(T_2 - T_1)\right]\)
  • \(\text{Resistance change (\%)} = \left(\frac{R_2}{R_1} - 1\right) \times 100\%\)
Conductor Temperature Rise Calculator
  • \(r = \frac{I}{I_{\mathrm{reference}}}\)
  • \(\Delta T_{\mathrm{allowable}} = T_{\mathrm{rating}} - T_{\mathrm{ambient}}\)
  • \(\Delta T_{\mathrm{estimated}} = \Delta T_{\mathrm{allowable}} \times r^2\)
  • \(T_{\mathrm{operating}} = T_{\mathrm{ambient}} + \Delta T_{\mathrm{estimated}}\)
Conductor Weight Calculator
  • \(w_{\mathrm{ft}} = \frac{w_{\mathrm{1000ft}}}{1000}\)
  • \(W_{\mathrm{row}} = w_{\mathrm{ft}}Lqr\)
  • \(W_{\mathrm{waste}} = W_{\mathrm{net}}\frac{w_{\%}}{100}\)
  • \(W_{\mathrm{planning}} = W_{\mathrm{net}} + W_{\mathrm{waste}}\)
  • \(W_{\mathrm{gross}} = W_{\mathrm{planning}} + W_{\mathrm{tare}}\)
Conduit Body Fill Calculator
  • \(\text{Total conductor area} = \text{area per conductor} \times \text{conductor count}\)
  • \(\text{Required area} = \text{total conductor area} + \text{splice/device allowance}\)
  • \(\text{Fill percent} = \frac{\text{required area}}{\text{conduit body capacity}} \times 100\%\)
  • \(\text{Spare area} = \text{conduit body capacity} - \text{required area}\)
Conduit Expansion Movement Calculator
  • \(\Delta T = T_{\mathrm{operating}} - T_{\mathrm{installation}}\)
  • \(\Delta L = \alpha L\Delta T\)
  • \(n_{\mathrm{fitting}} = \left\lceil\frac{|\Delta L|}{m_{\mathrm{fitting}}}\right\rceil\)
  • \(\overline{m} = \frac{|\Delta L|}{n_{\mathrm{fitting}}}\quad\text{when }n_{\mathrm{fitting}}>0\)
Conduit Fill Calculator
  • total conductor area = conductor area per conductor x conductor count
  • fill ratio percent = total conductor area / raceway internal area x 100
  • remaining raceway area = raceway internal area - total conductor area
  • 40% screening area limit = raceway internal area x 0.40 when conductor count >= 3
  • 40% screening margin = 40% screening area limit - total conductor area
  • passes 40% screening estimate = fill ratio percent <= 40 when conductor count >= 3
Conduit Support Spacing Calculator
  • \(L_{\mathrm{span}} = \max(L_{\mathrm{run}} - L_{\mathrm{end}}, 0)\)
  • \(n_{\mathrm{intermediate}} = \left\lceil\frac{L_{\mathrm{span}}}{s_{\max}}\right\rceil\)
  • \(n_{\mathrm{total}} = n_{\mathrm{end}} + n_{\mathrm{intermediate}} + n_{\mathrm{fitting}}\)
  • \(L_{\mathrm{last}} = L_{\mathrm{span}} - (n_{\mathrm{intermediate}}-1)s_{\max}\quad\text{when }L_{\mathrm{span}}>0\)
Conduit Trade Size Calculator
  • total conductor area = conductor count x area per conductor
  • conduit internal area = pi x (inside diameter / 2)^2
  • fill percent = total conductor area / conduit internal area x 100
  • required inside diameter = 2 x sqrt(total conductor area / (fill limit / 100) / pi)
  • fill margin = entered fill limit - calculated fill percent
DC Voltage Drop Calculator
  • voltage drop = 2 x current x one-way length x resistance per 1000 ft / 1000
  • voltage drop percent = voltage drop / system voltage x 100
  • entered margin = entered drop limit percent - voltage drop percent
Electrical Duct Bank Concrete Volume Calculator
  • \(W_{\mathrm{gross}} = n_{\mathrm{row}}d + (n_{\mathrm{row}} - 1)s_h + 2c\)
  • \(H_{\mathrm{gross}} = n_{\mathrm{rows}}d + (n_{\mathrm{rows}} - 1)s_v + 2c\)
  • \(V_{\mathrm{envelope}} = \frac{W_{\mathrm{gross}}H_{\mathrm{gross}}L}{1728}\)
  • \(V_{\mathrm{void}} = \frac{\pi\left(d/2\right)^2n_{\mathrm{total}}L}{1728}\)
  • \(V_{\mathrm{concrete}} = V_{\mathrm{envelope}} - V_{\mathrm{void}}\)
  • \(V_{\mathrm{order}} = V_{\mathrm{concrete}}\left(1 + \frac{w}{100}\right)\)
Equipment Grounding Conductor Size Calculator
  • area margin = selected area - entered required area
  • area margin percent = area margin / entered required area x 100
  • source status = source reference is present
Grounding Electrode Conductor Size Calculator
  • area margin = selected area - entered required area
  • area margin percent = area margin / entered required area x 100
  • source status = source reference is present
Medium Voltage Cable Drop Calculator
  • \(Z_{\mathrm{proj}} = R\cos\phi + X\sin\phi\)
  • \(V_{\mathrm{drop}} = k \times I \times L_{\mathrm{used}} \times \frac{Z_{\mathrm{proj}}}{1000}\)
  • \(V_{\mathrm{far}} = V_{\mathrm{system}} - V_{\mathrm{drop}}\)
  • \(\mathrm{Drop\ percent} = \frac{V_{\mathrm{drop}}}{V_{\mathrm{system}}} \times 100\%\)
  • \(P_{\mathrm{loss}} = n \times I^{2} \times R \times \frac{L_{\mathrm{used}}}{1000}\)
Parallel Conductor Calculator
  • \(\displaystyle I_{\text{ideal,set}}=\frac{I_{\text{total}}}{N_{\text{sets}}}\)
  • \(\displaystyle I_{\text{highest,set}}=I_{\text{ideal,set}}\left(1+\frac{\text{Mismatch (\%)}}{100}\right)\)
  • \(\displaystyle I_{\text{ampacity,total}}=N_{\text{sets}}\times I_{\text{ampacity,set}}\)
  • \(\displaystyle M_{\text{highest,set}}=I_{\text{ampacity,set}}-I_{\text{highest,set}}\)
Parallel Raceway Ampacity Calculator
  • current per raceway = total load current / parallel raceway count
  • adjusted ampacity per raceway = entered ampacity per raceway x adjustment factor
  • total adjusted ampacity = adjusted ampacity per raceway x parallel raceway count
  • ampacity margin = total adjusted ampacity - total load current
Raceway Fill Area Calculator
  • \(A_{\mathrm{allowable}}=A_{\mathrm{raceway}}\times\frac{\text{fill percent}}{100}\)
  • \(A_{\mathrm{available}}=A_{\mathrm{allowable}}-A_{\mathrm{reserved}}\)
  • \(\text{Reserved share}_{\%}=\frac{A_{\mathrm{reserved}}}{A_{\mathrm{allowable}}}\times100\)
Raceway Size Calculator
  • \(A_{\mathrm{required}}=\frac{A_{\mathrm{conductors}}}{\text{fill limit}/100}\)
  • \(A_{\mathrm{margin}}=A_{\mathrm{selected}}-A_{\mathrm{required}}\)
  • \(\text{Fill at selected area}_{\%}=\frac{A_{\mathrm{conductors}}}{A_{\mathrm{selected}}}\times100\)
Terminal Temperature Limit Check Calculator
  • \(\text{Continuous current} = \text{Load current} \times \frac{\text{Continuous load share}}{100}\)
  • \(\text{Required ampacity} = \text{Noncontinuous current} + \text{Continuous current} \times \frac{\text{Continuous-load multiplier}}{100}\)
  • \(\text{Required ampacity with spare} = \text{Required ampacity} \times \left(1 + \frac{\text{Spare margin}}{100}\right)\)
  • \(\text{Terminal margin} = \text{Entered terminal ampacity} - \text{Required ampacity with spare}\)
Voltage Drop Calculator
  • \(m = 2\text{ for single-phase or DC two-wire}
  • \ \sqrt{3}\text{ for balanced three-phase}\)
  • \(R_{op} = R_{75} \times [1 + \alpha(T_{op} - 75)]\)
  • \(Z_{eff} = R_{op} \times PF + X \times \sin(\cos^{-1} PF)\)
  • \(\Delta V = \frac{m \times I \times L \times Z_{eff}}{1000}\)
  • \(\Delta V_{\%} = \frac{\Delta V}{V_{\text{system}}} \times 100\%\)
Voltage Drop Length Calculator
  • \(V_{\mathrm{allowable}} = V_{\mathrm{system}}\times \frac{p_{\mathrm{drop}}}{100}\)
  • \(L_{\mathrm{max,one-way}} = \frac{V_{\mathrm{allowable}}\times 1000}{k_{\mathrm{phase}} I R_{1000}}\)
  • \(k_{\mathrm{phase}} = 2\text{ for single-phase or DC}
  • \ \sqrt{3}\text{ for three-phase}\)
Wire and Cable Takeoff Calculator
  • \(\mathrm{Base\ row\ length} = \mathrm{route\ length} + \mathrm{drop\ allowance} + \mathrm{termination\ allowance}\)
  • \(\mathrm{Row\ quantity} = \mathrm{base\ row\ length} \times \mathrm{conductor\ or\ cable\ quantity} \times \mathrm{parallel\ runs}\)
  • \(\mathrm{Quantity\ before\ waste} = \sum \mathrm{row\ quantities}\)
  • \(\mathrm{Waste\ allowance} = \mathrm{quantity\ before\ waste} \times \frac{\mathrm{waste\ percent}}{100}\)
  • \(\mathrm{Recommended\ planning\ quantity} = \mathrm{quantity\ before\ waste} + \mathrm{waste\ allowance}\)
Wire Derating Calculator
  • \(F_{\mathrm{combined}} = F_{\mathrm{ambient}} \times F_{\mathrm{bundling}}\)
  • \(A_{\mathrm{adjusted}} = A_{\mathrm{base}} \times F_{\mathrm{combined}}\)
  • \(F_{\mathrm{combined,percent}} = F_{\mathrm{combined}} \times 100\)
  • conductor count is a review flag only
  • it does not automatically select a bundling factor
  • final selection boundary = no code-compliant conductor or wire size selection is made by this calculator
Wire Pull Length Calculator
  • \(\text{Total straight length} = \sum \text{entered straight lengths}\)
  • \(\text{Total bend allowance} = \sum \text{entered bend allowances}\)
  • \(\text{Estimated pull length} = \text{Total straight length} + \text{Total bend allowance}\)
Wire Pulling Tension Calculator
  • \(W_{\mathrm{total}} = N \times w_{\mathrm{1000ft}} \times \frac{L_{\mathrm{ft}}}{1000}\)
  • \(T_{\mathrm{friction}} = W_{\mathrm{total}} \times \mu\)
  • \(T_{\mathrm{pull}} = T_{\mathrm{start}} + T_{\mathrm{friction}}\)
  • \(r_{\mathrm{ft}} = \frac{r_{\mathrm{in}}}{12}\)
  • \(P_{\mathrm{sidewall}} = \frac{T_{\mathrm{pull}}}{r_{\mathrm{ft}}}\)
  • \(T_{\mathrm{per\ conductor}} = \frac{T_{\mathrm{pull}}}{N}\)
Wire Size Calculator | Voltage-Drop Review
  • \(\ell_{\mathrm{loop}} = \frac{2L_{\mathrm{one\text{-}way}}}{1000}\)
  • \(\Delta V = I \times \ell_{\mathrm{loop}} \times R_{1000}\)
  • \(\Delta V_{\mathrm{percent}} = \frac{\Delta V}{V_{\mathrm{system}}} \times 100\)
  • \(\Delta V_{\mathrm{allowable}} = V_{\mathrm{system}} \times \frac{p_{\mathrm{allowable}}}{100}\)
  • \(R_{\mathrm{max},1000} = \frac{\Delta V_{\mathrm{allowable}}}{I \times \ell_{\mathrm{loop}}}\)
  • \(M_{\mathrm{pp}} = p_{\mathrm{allowable}} - \Delta V_{\mathrm{percent}}\)
Wireway Fill Calculator
  • \(\mathrm{Row\ occupied\ area} = \mathrm{area\ per\ conductor\ or\ cable} \times \mathrm{quantity}\)
  • \(\mathrm{Occupied\ area} = \sum \mathrm{row\ occupied\ areas}\)
  • \(\mathrm{Fill\ percentage} = \frac{\mathrm{occupied\ area}}{\mathrm{verified\ internal\ area}} \times 100\%\)
  • \(\mathrm{Entered\ limit\ area} = \mathrm{verified\ internal\ area} \times \frac{\mathrm{entered\ fill\ limit}}{100}\)
  • \(\mathrm{Fill\ margin} = \mathrm{entered\ limit\ area} - \mathrm{occupied\ area}\)
  • \(\mathrm{Fill\ comparison}: \mathrm{compare\ fill\ percentage\ with\ the\ entered\ fill\ limit}\)

Review basis

Sizing workflows need code-edition, conductor, temperature, raceway, and local inspection verification.

Everything under Wire, Raceway And Ampacity is a calculation from values you enter, not an approval. The pages here cite BS 7671, IEC 60364, and IEEE among their basis, so confirm the edition adopted in your jurisdiction against the source text before relying on a number for design or installation.

Where to go next: the formula reference, all calculators, or printable worksheets for the same calculations.