Generator Load Bank Calculator
Size a resistive load bank against a generator load-test target: real power to absorb, line current, reactive power the generator must supply, and whole bank steps per phase.
- Real power the bank must absorb
- kW
- Target apparent load
- kVA
- Reactive power from the generator
- kvar
- Line current
- A
- Bank steps per phase
- Applied bank load
- kW
- Bank capacity margin
- kW
- Capacity comparison
- Phase multiplier
- x
Calculation details
- Excitation note
- Stepping
- Calculation basis
- Review boundary
Recent results
Engineering notes
Code basis, calculation assumptions, and field-verification limits behind this calculator's result.
- Excitation note
- A resistive bank supplies no reactive power, so the generator supplies the 37.5 kvar for this target and runs leading. Use a reactive bank if the procedure needs the load to sit near unity power factor.
- Stepping
- Steps are rounded up to the next whole bank step, so the applied load is at or slightly above the target.
- Calculation basis
- Target apparent load is the generator kVA times the target percent. Target real power is that times the power factor, and line current is target kW divided by voltage and the phase factor. Bank steps are rounded up from the per-phase real power and the step size.
- Review boundary
- Arithmetic for sizing a resistive load bank against a target load only. Test duration, voltage and frequency tolerance, step sequencing, protection, cooling, engine derating for altitude and temperature, fuel and emissions limits, and the acceptance procedure all remain outside this calculation.
Formulas
- \(S_{\mathrm{target}} = kVA \times \frac{\mathrm{target\ \%}}{100}\)
- \(P_{\mathrm{target}} = S_{\mathrm{target}} \times \cos\phi\)
- \(Q_{\mathrm{generator}} = S_{\mathrm{target}} - P_{\mathrm{target}}\)
- \(I_{\mathrm{line}} = \frac{P_{\mathrm{target}} \times 1000}{V \times k}\)
- \(n_{\mathrm{steps}} = \left\lceil \frac{P_{\mathrm{target}}/n_{\mathrm{phases}}}{\mathrm{step\ kW}} \right\rceil\)
What this estimate covers
This page sizes a resistive load bank against a generator load-test target: the real power the bank has to absorb, the line current, the reactive power the generator has to supply itself, and how many whole bank steps that takes per phase.
Why the reactive power matters
Load banks are nearly always resistive, so a bank can only absorb real power. Reaching a target apparent load on a lagging power factor therefore needs the generator to supply the reactive part from its own excitation, which means it runs leading. If the acceptance procedure needs the load to sit near unity power factor, you need a reactive or combined bank rather than a resistive one.
Worked example
A 250 kVA generator at 480 V three phase taken to 75 percent gives a target of 187.5 kVA. At 0.8 power factor that is 150 kW and 180.4 A line current, so a bank with 10 kW steps needs 5 steps per phase, and the generator supplies 37.5 kvar.
Review boundary
Test duration, voltage and frequency tolerance, step sequencing, protection, bank cooling, engine derating for altitude and temperature, and fuel or emissions limits are outside this calculation. Use the procedure your engine builder or commissioning standard specifies.
FAQs
Can a resistive load bank reach a lagging power factor?
No. A resistive bank presents unity power factor. To test a lagging load you need a reactive or combined bank, or you accept that the generator supplies the reactive power and runs leading.
Why is the step count rounded up?
Load banks step in discrete increments, so rounding up is what actually gets applied. Rounding down would land below the target load, which is not what a load test is for.
How long should the load run?
That is set by the acceptance procedure you are following, not by this calculation. Manufacturer commissioning instructions and site standards specify duration and the voltage and frequency tolerances to hold.
Does this account for altitude or temperature derating?
No. If the set is above its rating altitude or ambient, derate the generator before deciding the target, because a derated generator cannot reach the percentage you entered.