Battery, Generator And Backup Power
Battery amp-hours, backup runtime, inverter watts, generator kW, UPS runtime, and fuel cost calculators.
Sub-topics in this category
The 6 calculators in Battery, Generator And Backup Power grouped into 8 sub-topics by the work each is built for. A calculator appears under every sub-topic it serves, so these groups overlap where the same page answers more than one question.
Backup Power
Generator and backup-power planning workflows.
-
Inverter Efficiency Calculator
Calculate inverter efficiency from DC input and AC output power.
-
Off Grid Load Calculator
Estimate daily and autonomy energy for an off-grid load.
-
Solar Battery Runtime Calculator
Evaluate solar battery runtime for an early planning or field-review decision.
-
UPS Battery Size Calculator
Estimate UPS battery energy and amp-hours for a target runtime.
-
UPS Runtime Calculator
Estimate UPS runtime from usable battery energy and load.
Battery Storage
Battery energy, runtime, and capacity estimation workflows.
-
Off Grid Load Calculator
Estimate daily and autonomy energy for an off-grid load.
-
Solar Battery Runtime Calculator
Evaluate solar battery runtime for an early planning or field-review decision.
-
UPS Battery Size Calculator
Estimate UPS battery energy and amp-hours for a target runtime.
-
UPS Runtime Calculator
Estimate UPS runtime from usable battery energy and load.
Engineering Estimate
Formula-backed estimates that require professional verification before final use.
-
Generator Load Bank Calculator
Size a resistive load bank to load a generator to a target percentage.
-
Solar Battery Runtime Calculator
Evaluate solar battery runtime for an early planning or field-review decision.
-
UPS Battery Size Calculator
Estimate UPS battery energy and amp-hours for a target runtime.
Equipment Review
Equipment-data and nameplate review workflows.
-
Generator Load Bank Calculator
Size a resistive load bank to load a generator to a target percentage.
-
Inverter Efficiency Calculator
Calculate inverter efficiency from DC input and AC output power.
-
UPS Battery Size Calculator
Estimate UPS battery energy and amp-hours for a target runtime.
UPS
Uninterruptible power supply capacity and runtime workflows.
-
UPS Battery Size Calculator
Estimate UPS battery energy and amp-hours for a target runtime.
-
UPS Runtime Calculator
Estimate UPS runtime from usable battery energy and load.
Capacity Margin
Capacity, margin, and preliminary headroom screens.
-
Generator Load Bank Calculator
Size a resistive load bank to load a generator to a target percentage.
Load Accounting
Transparent connected-load and worksheet accounting workflows.
-
Off Grid Load Calculator
Estimate daily and autonomy energy for an off-grid load.
Power Electronics
Power-electronics and component behavior screens.
-
Inverter Efficiency Calculator
Calculate inverter efficiency from DC input and AC output power.
What this topic covers
About this category
6 calculators are grouped under Battery, Generator And Backup Power, and the work splits into Backup Power, Battery Storage, Engineering Estimate, Equipment Review. Every page states the formula it applies, the inputs and units it expects, and the limits of the estimate, so a result can be checked against the adopted code edition and the equipment nameplate before it is used for a design decision.
Written for Electricians, Engineers, Estimators, Facility Teams, and Technicians.
Formulas used in this category
The arithmetic the 6 calculators in Battery, Generator And Backup Power apply, in the order it is evaluated. These are calculation summaries, not code text — verify each against the source standard before design use. Full explanations for every topic are in the formula reference index.
Show formula sheet (6 calculators)
- Generator Load Bank Calculator
-
- \(S_{\mathrm{target}} = kVA \times \frac{\mathrm{target\ \%}}{100}\)
- \(P_{\mathrm{target}} = S_{\mathrm{target}} \times \cos\phi\)
- \(Q_{\mathrm{generator}} = S_{\mathrm{target}} - P_{\mathrm{target}}\)
- \(I_{\mathrm{line}} = \frac{P_{\mathrm{target}} \times 1000}{V \times k}\)
- \(n_{\mathrm{steps}} = \left\lceil \frac{P_{\mathrm{target}}/n_{\mathrm{phases}}}{\mathrm{step\ kW}} \right\rceil\)
- Inverter Efficiency Calculator
-
- efficiency ratio = AC output power W / DC input power W
- efficiency percent = efficiency ratio x 100
- loss power W = DC input power W - AC output power W
- Off Grid Load Calculator
-
- daily load kWh = average load W x hours per day / 1000
- autonomy energy kWh = daily load kWh x days of autonomy
- autonomy Ah = autonomy energy kWh x 1000 / system voltage V
- Solar Battery Runtime Calculator
-
- \(\text{Nominal energy}=\text{Battery capacity}\times\text{System voltage}\)
- \(\text{Usable energy}=\text{Nominal energy}\times\text{Depth of discharge}/100\times\text{Efficiency}/100\)
- \(\text{Runtime}=\text{Usable energy}/\text{Load}\)
- UPS Battery Size Calculator
-
- \(E_{\mathrm{load}}[\mathrm{Wh}] = P_{\mathrm{load}}[\mathrm{W}]\times t_{\mathrm{runtime}}[\mathrm{h}]\)
- \(\eta = \frac{\eta_{\%}}{100},\quad c_{\mathrm{usable}} = \frac{c_{\mathrm{usable,\%}}}{100}\)
- \(E_{\mathrm{battery,required}}[\mathrm{Wh}] = \frac{E_{\mathrm{load}}[\mathrm{Wh}]}{\eta c_{\mathrm{usable}}}\)
- \(C_{\mathrm{battery,required}}[\mathrm{Ah}] = \frac{E_{\mathrm{battery,required}}[\mathrm{Wh}]}{V_{\mathrm{system}}[\mathrm{V}]}\)
- UPS Runtime Calculator
-
- \(E_{\mathrm{available}} = E_{\mathrm{battery,usable}}\times \eta \times f_{\mathrm{reserve}}\)
- \(t_{\mathrm{hours}} = \frac{E_{\mathrm{available}}}{P_{\mathrm{load}}}\)
- \(t_{\mathrm{minutes}} = 60t_{\mathrm{hours}}\)
Review basis
Backup-power workflows use entered assumptions and do not approve listed equipment, protection, transfer equipment, battery safety, utility interconnection, or code compliance.
Everything under Battery, Generator And Backup Power is a calculation from values you enter, not an approval. Confirm the code edition adopted in your jurisdiction, the equipment nameplate data, the utility or authority requirements, and the project conditions before relying on any number for design or installation.